31 December 1942 Part 7
Summary
Island readiness construction and reorganisation annexes (monthly entry)
Location Details
Cherbourg; Cotentin
Diary Entry
December 1942 Island readiness construction and reorganisation annexes
Editorial note: Monthly report or annex; placed at the end of the reporting month because no single document date is supplied. Dates within the text retain their original meaning. The annex summaries cover October–December and have no single date in the supplied translation. They are placed at the end of that period. Figure dates, where visible, govern the individual figure entries elsewhere.
Enemy reconnaissance and bomber activity continued over the mainland and Channel Islands. Orders covered reports on fortification progress, close defence of strongpoints, artillery readiness, anti-parachute measures and the employment of reserves. Training courses for officers included armoured warfare and anti-tank tactics. The corps also reviewed its organisation, strength and equipment in light of fixed coastal responsibilities and the conversion of formations to static divisions.
Bad weather repeatedly interrupted sea communications with the islands. The diary records aircraft crossings, maritime plots and the maintenance of coastal observation. During the final week the withdrawal of 320th Infantry Division was delayed, while elements of Grenadier Regiment Reithinger and other units were reassigned. Commander-in-Chief West ordered increased patrol activity on 31 December. The closing sheets list the December intelligence, quartermaster, personnel and strength annexes.
Construction conferences compared the number of permanent works planned for Cherbourg, the Orne sector and the Channel Islands, and reconciled differing assessments of their tactical priority. Orders governed anti-tank defence, demolition of weapons to prevent capture, mine-laying, strongpoint reserves and the allocation of captured artillery. The papers also document the relief of formations, the organisation of the Cherbourg defended area and the progressive conversion of the island and coastal garrisons into static formations.
The succeeding papers cover enemy air and naval activity, coastal construction, equipment and ammunition, defence against raids and airborne landings, and the reorganisation of the corps after the replacement of mobile formations by static divisions. Intelligence reports evaluate British reconnaissance, commando methods, landing craft, likely objectives and the possibility of attacks against ports or the Channel Islands. Divisional and corps instructions emphasise rapid reporting, immediate local action and the retention of mobile reserves wherever manpower permitted.
Construction and artillery annexes record priorities for ports, batteries, beach defences, minefields, communications and command posts. They also show the distribution of Army and naval artillery, the relationship between mainland sectors and the Channel Islands, and proposed changes to divisional boundaries. Strength and equipment returns reveal continuing shortages of trained crews, motor transport and specialist personnel while fixed weapons and completed positions increased.
Channel Islands and Cotentin situation sketch accompanying the reorganisation papers. Source PDF page 0666.
The final annex sequence contains divisional reports, fortification and training instructions, artillery and engineer papers, personnel and equipment returns, transport arrangements, intelligence assessments and correspondence on the relief of 320th Infantry Division. The documents trace the establishment of 709th Infantry Division in the Cotentin, the static reorganisation of 319th and 716th Infantry Divisions, the allocation of corps troops and the maintenance of reserves under restricted transport and manpower conditions.
Operational lessons stress all-round defence of strongpoints, cooperation between services, immediate resistance to raids, protected communications and the preparation of counter-attacks. The annexes also document air attacks, naval plots, convoy protection, mine dangers, sabotage precautions, coastal patrols and the reporting of enemy landings. The closing strength and organisation returns preserve the detailed composition of formations and fixed batteries at the end of 1942.
Corps situation map accompanying the late-1942 annexes. Source PDF page 0735.
Organisation diagram accompanying the late-1942 annexes. Source PDF page 0736.
Source of Information
T-314 Roll 1603, T314_Roll_1603_English_Translation.docx. Source PDF pages 0408–0426 | Daily diary entries and annex register, 1–31 December 1942; Source PDF pages 0460–0558 | Signals, orders, strength returns, maps and organisation diagrams; Source PDF pages 0559–0681 | Intelligence, construction, artillery and reorganisation papers; Source PDF pages 0682–0838 | Operational papers, intelligence reports, returns, maps and folder closure
_edited.png)


