1 July 1943 Part 18
Summary
Channel Islands permanent construction returns
Location Details
Jersey; Guernsey; Alderney; Sark; Channel Islands
Diary Entry
1 July 1943 Channel Islands permanent construction returns
These four returns show permanent construction for the whole 319th Infantry Division sector, Alderney, Guernsey with Sark, and Jersey. Overall percentages as printed, in the order completed / under construction / not begun:
319th Infantry Division: 22% / 23% / 55%.
Alderney: 10% / 9% / 81%.
Guernsey and Sark: 31% / 36% / 33%.
Jersey: 23% / 21% / 56%.
The columns give planned totals, completed works, works under construction and works not yet begun, first as counts and then as percentages. The overall percentages are those printed by the German compilers; they have not been recalculated by adding unlike structures and kilometres of obstacles. Dashes should not automatically be treated as independently verified zeroes.
Row | English rendering of the German row heading
1 | Tobruk positions
2 | Open machine-gun positions
3 | Machine-gun embrasure positions
4 | Machine-gun embrasure turrets
5 | M19 combat position
6 | Armoured rotating turret for machine gun
7 | Armoured rotating turret for machine gun and 4.7 cm gun
8 | Armoured rotating turret for machine gun and 3.7 cm gun
9 | Armoured rotating turret for 3.7 cm gun
10 | Open anti-tank gun positions
11 | Anti-tank gun embrasure position
12 | Anti-tank gun shelter
13 | Infantry gun position
14 | 5 cm tank-gun position
15 | Mortar positions
16 | Open gun positions
17 | Gun shelter
18 | Gun casemate
19 | Anti-aircraft gun positions
20 | Searchlight positions
21 | Flamethrower positions
22 | Ammunition bunkers
23 | Personnel bunkers
24 | Provisions bunkers
25 | Water installations
26 | Medical bunkers
27 | Decontamination stations
28 | Signals bunkers
29 | Machinery bunkers
30 | Command bunkers
31 | Observation posts
32 | Wire obstacles in kilometres
33 | Anti-tank obstacles
Ständig = permanent; feldmäßig = field construction; fertig = completed; im Bau = under construction; noch nicht begonnen = not yet begun; Gesamtplanung = total planned. The original columns and numbers remain in the following facsimiles.
Editorial note: these are separate Seventh Army returns, with different categories from the Fortress Engineer Staff 19 construction-progress chart already included from T-78 Roll 317 for 1 July 1943. They are complementary evidence, not another copy of that chart.
Original source image 00269.jpg — T-312 Roll 1563. Channel Islands permanent construction returns.
Original source image 00270.jpg — T-312 Roll 1563. Channel Islands permanent construction returns.
Original source image 00271.jpg — T-312 Roll 1563. Channel Islands permanent construction returns.
Original source image 00272.jpg — T-312 Roll 1563. Channel Islands permanent construction returns.
Source of Information
German Seventh Army records, NARA T-312 Roll 1563. T312_R1563_Jersey_and_Channel_Islands_English_Translation.docx. File 41703/37 • Scans 00269, 00270, 00271, 00272 • 1 July 1943. Local scan references identify the supplied image filenames, not substituted microfilm frame numbers.
_edited.png)